Background and Pre-Feasibility Study Reports

A Pre-Feasibility Study has been completed and the reports it involved are below:

The links below are to the various reports which make up the full Pre-Feasibility Study:

Historical Studies 

The Manuherikia catchment has been studied extensively during the past 150 years and numerous reports have been written. Click here to read historical reports on:

  1. An insight into why certain infrastructure decisions were made and what other options were considered at the time;

  2. A record of dam material and construction methods;

  3. The challenges of the existing infrastructure and ideas for improvement;

  4. Numerous ideas on new development options; and

  5. Hydrological data dating back more than a century.

These reports contain multi-generation knowledge which is making a very valuable contribution to the current studies.